Thank you very much for your reply.<br><br>When I use the heartbeat stack, it takes 3 sec. In the same environment, it takes less than 1 sec with OpenAIS stack. I am using RHEL 5 rpms from Pacemaker and Pacemaker 1.0.4. Did any body measure the time takes from demote to promote on both stacks? I wonder whether other people have the same result or not.<br>
<br>Thanks<br>hj<br><br><div class="gmail_quote">On Tue, Jul 28, 2009 at 2:26 AM, Andrew Beekhof <span dir="ltr"><<a href="mailto:andrew@beekhof.net">andrew@beekhof.net</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;"><div class="im"><br>
> 2. By using co-location constraint, the time takes from demote to promote is<br>
> around 3 sec(when notify is enabled) and 1 sec (when notify is disabled).<br>
> For mission critical application, I think a downtime of 1 or 3 sec is too<br>
> long. How can I minimize this transition time?<br>
<br>
</div>Its purely down to your network and what the resource is doing during<br>
the promote/demote and notify actions.<br></blockquote></div><br>